? Auditor Details

Auditor Details

Accreditation level

Status:
Inactive
Granted:
Road Safety Auditor

Contact details

Business

Name:
Mr Guy Wilkinson
Organisation:
Parsons Brinckerhoff
Position:
Civil Engineer
Email:
gwilkinson@pb.com.au
Phone:
(03) 9861 1118
Mobile:
NA
Fax:
NA
Address:
Level 15 28 Freshwater Place
Southbank, VIC 3006

Relevant professional experience

Organisation:
Parsons Brinckerhoff
Position:
Civil Engineer
Time Period:
2/06/2014 to Current
Description:
Lloyd St Grade Separation project (Perth, WA). Independent verification of detailed design and construction drawings for road/rail grade separation including road design package.
Organisation:
Parsons Brinckerhoff
Position:
Civil Engineer
Time Period:
3/02/2014 to Current
Description:
Bayley St West project (Vic). Functional and detailed design of bus interchange at Geelong Railway Station including associated car park and kiss and ride.
Organisation:
Parsons Brinckerhoff
Position:
Civil Engineer
Time Period:
2/09/2013 to Current
Description:
MAX Light Rail project (Perth, WA). Corridor design manager for concept design of Light Rail system through the Perth city centre.
Organisation:
Parsons Brinckerhoff
Position:
Civil Engineer
Time Period:
3/11/2010 to Current
Description:
M80 Tulla Sydney Alliance project (Vic). Detail geometric design of freeway, barriers, shared paths and other civil elements

Valid interstate accreditation

No visible accreditation letters have been uploaded.

Road Safety Audit expertise

  Stage 1
Feasibility
Stage 2
Functional
Stage 3
Detailed
Stage 4
Pre-opening
Stage 5
Existing roads
Bicycles
Freeways
General
Intersections
Local area traffic management
Motorcycles
Other
Pedestrians
Worksite traffic management plans

Regions available to perform RSAs

  • Eastern
  • Metro. North West
  • Metro. South East
  • North Eastern
  • Northern
  • South Eastern
  • Western

Past audits

There are currently no visible audits recorded.

Road safety courses

Run by:
VicRoads / LGPro course in VicRoads, Denmark St, Kew on the 20/08/2012
Comment:
Road Safety Engineering Workshop (5 days) - run by Phil Jordan and John Coles
Refresher:
Attachment:
Certificate - VicRoads Road Safety Audit.PDF - Road Safety Engineering Workshop (5 days) - certificate of attendance
blancpain replica watches roger dubuis replica watches Chopard Replica Watches Corum replica Zenith Replica Watches Replica Watches